Pre-Construction

OPUS Coconut Grove

New Pre-Construction Condos in Coconut Grove, Miami

3137 SW 27th Ave, Miami, FL 33133

Developer asking priceFrom $2,600,000Confirm current release pricing
Estimated delivery2027Subject to change
Building stories6
Residences14

About OPUS Coconut Grove

OPUS Coconut Grove, also called OPUS Grove, is a six-story boutique condominium under construction at 3137 SW 27th Avenue in Coconut Grove, Miami, FL 33133. The site also includes 3127 SW 27th Avenue, the address the MLS uses. The developer is META Development, a joint venture of Lucid Investment Group and Iron Capital. Kobi Karp designed the building, Brazilian designer Joao Armentano is doing the interiors in his first Miami project, and the sales team credits David O. Design with the landscape. The building has 14 residences: 12 three-bedroom, three-and-a-half-bath residences on levels 2 through 4, four per floor, plus two penthouses. The developer floor plans show the standard residences at 1,905 to 2,548 square feet inside, with terraces of about 307 to 956 square feet. The published range for the whole building, penthouses included, is 1,905 to 3,884 square feet. Residences have ceilings up to 12 feet, floor-to-ceiling impact glass, private terraces with wraparound terraces on the corners, private or semi-private elevator access with secured foyers, porcelain floors, full-size washers and dryers and smart-home infrastructure. Kobi Karp's facade uses Roman travertine and wood slats. The roof holds a pool with a bar, lounge and outdoor kitchen. The rest of the program adds a 4,300-square-foot sundeck, a fitness center, a spa with sauna, steam and massage rooms, a business lounge and private business suites with a conference room, a children's playroom, private wine storage, indoor and outdoor lounges, bike storage, and 24-hour concierge, valet and security. Parking uses a KLAUS automated multiparking system with up to three spaces per residence and EV charging. META closed a $28 million construction loan from Arixa Capital in August 2025. The Nicolas Group at SERHANT has been the exclusive sales team since December 2025, and the current completion target is 2027. Join the waitlist on this page for availability and floor plans, and check current OPUS listings as resales come to market.

Building Highlights

  • Rooftop pool with bar, lounge and outdoor kitchen
  • 4,300 sq ft sundeck
  • Fitness center
  • Spa with sauna, steam and massage room
  • Business lounge and private business suites
  • Children's playroom
  • Private wine storage
  • Indoor and outdoor lounges

Project Highlights

Developer

META Development

Architect

Kobi Karp Architecture

  • 12 three-bedroom residences plus 2 penthouses
  • Three- and four-bedroom layouts
  • Ceilings up to 12 feet
  • Floor-to-ceiling impact glass
View all 8 residence highlights
  • Private terraces, wraparound on corner residences
  • Private or semi-private elevator access with secured foyers
  • Full-size washer and dryer
  • Interiors by Joao Armentano

Interested in OPUS Coconut Grove?

Ask about available residences, current pricing, and purchase options.

Floor plans & residence types

12 unit lines
Browse published plans & unit lines
Apt#ModelBed / BathsFloorsInterior + Ext (Sq Ft)
2AResidence 2A3 / 3.521,946 + 325
2BResidence 2B3 / 3.522,548 + 319
2CResidence 2C3 / 3.521,945 + 331
2DResidence 2D3 / 3.522,544 + 325
3AResidence 3A3 / 3.531,940 + 331
3BResidence 3B3 / 3.531,926 + 956
3CResidence 3C3 / 3.531,944 + 332
3DResidence 3D3 / 3.531,905 + 948
4AResidence 4A3 / 3.541,940 + 331
4BResidence 4B3 / 3.541,926 + 307
4CResidence 4C3 / 3.541,944 + 332
4DResidence 4D3 / 3.541,905 + 307

Floor plans and unit details are subject to change. Contact us for the most current information.

Documents

Purchase & delivery

Location

3137 SW 27th Ave, Miami, FL 33133

Location Scores

Compare buildings in Coconut Grove

Frequently Asked Questions About OPUS Coconut Grove

What are the prices at OPUS Coconut Grove?
Residences at OPUS Coconut Grove are currently priced from $2.6M to $8.0M, based on developer pricing on file. Pre-construction pricing changes as releases sell through, so treat this as the range at last update.
When will OPUS Coconut Grove be completed?
OPUS Coconut Grove is currently scheduled for completion in 2027. Delivery dates on pre-construction projects move; the purchase contract, not the marketing timeline, governs the outside delivery date.
Who is the developer of OPUS Coconut Grove?
OPUS Coconut Grove is being developed by META Development, with architecture by Kobi Karp Architecture.
How many units will OPUS Coconut Grove have?
OPUS Coconut Grove is planned for 14 residences across 6 floors in Coconut Grove.